Project Name : Lamabagar-Barhabise 220 kV Transmission Line Project
Project Location    Dolakha-Sindhupalchowk, Bagmati Province, Nepal
T/L Starting Point   Lamabagar Substation, Bigu Rural Municipality, Dolakha District 
Termination Point   Barhabise Substation, Barhabise Municipality, Sindhupalchowk District
Transmission Line Voltage level 220 kV
  Length 43.7 km
  Power Evacuation Capacity 1240 MW
  Type of Line Double Circuit with ACSR Twin MOOSE Conductor on Lattice Tower
Major Hydro power   Lapche HEP (160 MW) Upper Lapche HEP(52MW), Lapche Tamakoshi HEP (40 MW), Jum Khola HEP (56 MW), Rolwaling HEP (88 MW),