Lamabagar-Barhabise 220 kV Transmission Line Project |
|
Project Name : |
Lamabagar-Barhabise 220 kV Transmission Line Project |
Project Location |
|
Dolakha-Sindhupalchowk, Bagmati Province, Nepal |
T/L Starting Point |
|
Lamabagar Substation, Bigu Rural Municipality, Dolakha District |
Termination Point |
|
Barhabise Substation, Barhabise Municipality, Sindhupalchowk District |
Transmission Line |
Voltage level |
220 kV |
|
Length |
43.7 km |
|
Power Evacuation Capacity |
1240 MW |
|
Type of Line |
Double Circuit with ACSR Twin MOOSE Conductor on Lattice Tower |
Major Hydro power |
|
Lapche HEP (160 MW) Upper Lapche HEP(52MW), Lapche Tamakoshi HEP (40 MW), Jum Khola HEP (56 MW), Rolwaling HEP (88 MW), |
|