Mewa - Change 132 kV Transmission Line Project |
|
|
Voltage Level: |
132 kV |
|
No of Circuit: |
Double Circuit |
|
Proposed Conductor: |
ACSR Bear |
|
Estimated Power Evacuation: |
150 MW |
|
Starting Point: |
Mewa Substation |
|
Ending Point: |
Dhungesanghu Substation |
|
Estimated Length: |
50 circuit km |
|
No of Substation: |
1 (Mewa substation) |
|
Mewa Substation |
Papung, Taplejung |