Haitar-Sitalpati (Arun Corridor) 400 kV Transmission Line Project |
|
Project Name : |
Haitar-Sitalpati (Arun Corridor) 400 kV Transmission Line Project |
Project Location |
|
Sankhuwasabha District, Koshi Province, Nepal |
T/L Starting Point |
|
Haitar Substation (400/132kV), Makalu Rural Municipality, Sankhuwasabha District |
Termination Point |
|
Sitalpati Substation (400/220kV), Khandbari Municipality, Sankhuwasabha District |
Transmission Line |
Voltage level |
400 kV |
|
Length |
35 km |
|
Power Evacuation Capacity |
2260 MW |
|
Type of Line |
Double Circuit with ACSR Quade MOOSE Conductor on Lattice Tower |
Major Hydro power |
SN
|
Hydro Power Projects
|
Capacity (MW)
|
1
|
Kimathanka Arun
|
454.00
|
2
|
Upper Arun HEP
|
1063.00
|
3
|
Ikhuwa Khola
|
40.00
|
4
|
Kasuwa Khola HPP
|
45.00
|
5
|
Chujung Khola HEP
|
63.00
|
6
|
Upper Chujung Khola HEP
|
40.00
|
7
|
Bakan Khola HEP
|
44.00
|
8
|
Upper Barun Khola
|
55.00
|
9
|
Lower Barun Khola HPP
|
132.00
|
10
|
Isuwa Khola
|
97.20
|
11
|
Lower Isuwa
|
38.52
|
12
|
Upper Isuwa
|
24.30
|
Total
|
2096.02
|
|
|