Haitar-Sitalpati (Arun Corridor) 400 kV Transmission Line Project
 
Project Name : Haitar-Sitalpati (Arun Corridor) 400 kV Transmission Line Project
Project Location    Sankhuwasabha District, Koshi Province, Nepal
T/L Starting Point   Haitar Substation (400/132kV),  Makalu Rural Municipality, Sankhuwasabha District 
Termination Point   Sitalpati Substation (400/220kV),  Khandbari Municipality, Sankhuwasabha District
Transmission Line Voltage level 400 kV
  Length 35 km
  Power Evacuation Capacity 2260 MW
  Type of Line Double Circuit with ACSR Quade MOOSE Conductor on Lattice Tower
Major Hydro power

SN

Hydro Power Projects

Capacity (MW)

1

Kimathanka Arun

454.00

2

Upper Arun HEP

1063.00

3

Ikhuwa Khola

40.00

4

Kasuwa Khola HPP

45.00

5

Chujung Khola HEP

63.00

6

Upper Chujung Khola HEP

40.00

7

Bakan Khola HEP

44.00

8

Upper Barun Khola

55.00

9

Lower Barun Khola HPP

132.00

10

Isuwa Khola

97.20

11

Lower Isuwa

38.52

12

Upper Isuwa

24.30

Total

2096.02