Nalgad (Danipipal) - Maintada Transmission Line Project

Voltage Level:

400 kV

No of Circuit:

Double Circuit

Proposed Conductor:

ACSR Quad Moose

Estimated Power Evacuation:

2500 MW

Starting Point:

Nalgad Substation (Danipipal)

Ending Point:

Maintada Substation

Estimated Length:

150 circuit km

No of Substation:

2 (Nalgad Substation, Maintada Substaion)

Nalgad Substation

Danipipal, Nalgad, Jajarkot

Maintada Substation

Maintada, Bheriganga, Surkhet