Nalgad (Danipipal) - Maintada Transmission Line Project |
|
Voltage Level: |
400 kV |
No of Circuit: |
Double Circuit |
Proposed Conductor: |
ACSR Quad Moose |
Estimated Power Evacuation: |
2500 MW |
Starting Point: |
Nalgad Substation (Danipipal) |
Ending Point: |
Maintada Substation |
Estimated Length: |
150 circuit km |
No of Substation: |
2 (Nalgad Substation, Maintada Substaion) |
Nalgad Substation |
Danipipal, Nalgad, Jajarkot |
Maintada Substation |
Maintada, Bheriganga, Surkhet |