Kimanthanka Arun - Arun Hub Transmission Line Project

Kimanthanka Arun – Arun Hub Transmission Line Project

Voltage Level:

400 kV

No of Circuit:

Double Circuit

Proposed Conductor:

ACSR Quad Moose

Estimated Power Evacuation:

2500 MW

Starting Point:

Kimanthanka Substation

Ending Point:

Inaruwa Substation

Estimated Length:

72 circuit km

No of Substation:

2 (Kimanthanka Substation, Arun Substation)

Kimanthanka Substation

Hatiya, Sankuwasabha

Arun Substation

Diding, Sankhuwasabha