Voltage Level:

400 kV

No of Circuit:

Double Circuit

Proposed Conductor:

ACSR Quad Moose

Estimated Power Evacuation:

2500 MW

Starting Point:

Phukot Substation

Ending Point:

Dododhara Substation (extended up to Karmadev for cross border connection)

Estimated Length:

240 circuit km

No of Substation:

3 (Phukot, Betan and Dododhara)

Phukot Substation:

Khadachakra , Kalikot

Betan Substation:

Chaukune, Surkhet

Dododhara Substation:

Dododhara, Kailali